Lift removals Sydney

Controlled removal.
Clear site.

DIRECT CONTACT

Darren Fergusson
Director and lift specialist
0405 187 272

Specialist scope

Planned around what comes next.

AVEC manages the safe, controlled removal of redundant lift equipment, with the practical lift knowledge to plan sequencing, access and handover.

01

Decommissioning

Site assessment, isolation planning and coordination before removal work begins.

02

Lift equipment removal

Removal of lift cars, machinery, controllers, landing doors, frames, hydraulic equipment and associated components as required.

03

Builder coordination

Clear sequencing around demolition, structural works, access and the next stage of the project.

04

Make-safe and handover

A clean, practical handover of the work area for following trades.

How we work

Experience inside the shaft
and around the site.

01 / ASSESS

Understand the existing lift

We review the equipment, building access and removal constraints before work begins.

02 / SEQUENCE

Plan the removal

The work is staged around lifting, cutting, movement of materials and other trades.

03 / DELIVER

Remove and hand over

Redundant equipment is removed and the area is left ready for the next scope.

Removal in motion

Rigging, cutting
and controlled movement.

Short examples from active lift removal works. Videos play silently and loop automatically.

01 Rigging lift equipment inside the shaft
02 Controlled movement and removal
03 Controlled oxy cutting
Discuss a removal

Speak directly
with Darren.

Send the site address, lift type, number of floors and any available photos or plans. If equipment needs to be transported or positioned as part of the scope, see our equipment relocation and crane truck service.

Call 0405 187 272